Congratulations on this latest milestone. Now it's time for the paving, roadworks and tunnel electromechanical systems installation teams.
As a reminder, this motorway project is one of the most important in Norway, linking two major urban centers, Oslo and Kristiansand. The section, which will link the towns of Langangen and Rugtvedt, is 17 kilometers long and includes the construction of several structures such as the Bjønnås twin-tube tunnel (2 x 2.5 km) and the Grenland tunnel (5.1 km).
Photo credit: Thanks to our topographer Maxime Bocrie for the photos!
-
11.12.2024In Norway, Eiffage Génie Civil has completed the breakthrough...On the E18 | Lot 2 project, our Eiffage Génie Civil teams completed the breakthrough of the Grenland tunnel (2 x 5.1 km), with the attack and counter-attack meeting...
-
27.11.2024In Togo, Eiffage Génie Civil Marine has been entrusted...Lome Container Terminal has entrusted the deepening works of the main quay at the Port of Lomé to the teams of Eiffage Génie Civil Marine and Eiffage in Togo.
-
19.11.2024In Colombia, on the Puerto Antioquia project, 650 piles...A new milestone has been reached: the 650th pile has been driven!