18.04.2024
In Monaco, Eiffage Metal orchestrates the airlifting of masts onto the "Mareterra" real estate complex.
After several months of design by our engineering and manufacturing services, we are pleased to announce the installation of two masts, 28 and 38 meters high, at the top of this complex.
To accomplish this, our teams first assembled the masts on the Rainier III quay, and then a "Super Puma" from SAF company airlifted the structures, weighing respectively 1.4 and 2.3 tons, to the roof of the residence.
Rope access technicians from MTH company then took over to detach the attachments located at 17 and 27 meters along the masts.
Congratulations to our teams mobilized on this extraordinary project!
This project demonstrates the technical expertise of our teams and our capacity to innovate in order to make exceptional projects, such as "Mareterra," a reality and to shape a future where sustainable design goes hand in hand with elegance.
Watch the images of this large-scale operation!
-
11.10.2024In Brest (29), the construction of the future bridge...Led by the ETPO consortium, a subsidiary of the ETPO Group, in partnership with Eiffage Métal, on behalf of BMa - Brest Métropole Aménagement, the construction of...
-
04.07.2024Eiffage consortium wins the contract to build four...Eiffage, through its Belgian Eiffage Métal subsidiary Smulders, in a consortium with HSM Offshore Energy and Iv‑Offshore & Energy recently secured the EPCIC[1] contract...
-
06.06.2024Eiffage Métal signs the new glass roof of the headquarters...For over three years, the Eiffage Métal teams have been involved in the design, fabrication, and installation of the glass roof of the atrium in the building, located...